Aluminium partitions and glass cabins on a leased floor, built to the landlord ceiling.
Completed June 2025
The floor had a grid and an AC layout we were not allowed to move. Cabins were set to that grid. Glass was used on the corridor and solid panels where screens faced the aisle. Electrical points were added inside each cabin before the skirting closed. The work had to finish before a Monday occupation, so the programme was written backwards from that morning.